Blossburg

Blossburg, PA · Traffic & Transit
rewind1077.com
DOT to implement visibility upgrades at Ithaca intersection
ITHACA, NY (607NewsNow) – The New York State Department of Transportation is addressing issues at an intersection in Ithaca. Earlier this year, Tompkins County Legislator John Hunt contacted the DOT after constituents raised safety concerns about the intersection of Pine Tree Road and NYS Route 79. For years, residents...
The Ithaca Voice
Planning Board pauses Waters Edge over concerns of retail space, too much parking
Parking was on the minds of the City of Ithaca Planning & Development Board. On Sept. 22, the board delayed preliminary site plan approval for the Water’s Edge project over concerns that it included too much parking. The board also raised concerns about Beginnings Federal Credit Union’s parking lot expansion on North Meadow Street. Members also expressed concerns about extending site plan approval for a previous project because of excess parking.
WETM 18 News
Driving safety tips as the leaves begin to fall
(WETM) – Though the foliage in the Twin Tiers is beautiful during the fall, the time of year can also come with some things drivers need to be extra aware of when driving. Caution! Slippery when wet! We all know that in the fall, leaves, well, fall. But once they’ve hit the ground, they can […]
14850 Magazine
Forest Home Garage closed beginning at 10am Saturday for pavement work
The Forest Home Garage on the Cornell campus will be closed beginning at 10am Saturday "due to pavement maintenance work at the garage entrance," according to an alert Friday afternoon from Cornell University. [...]
WETM
Wysox road to be closed daily for pipe replacement
Wysox road to be closed daily for pipe replacement.
Wellsboro Gazette
Wellsboro traffic signal to return soon
WELLSBORO — The traffic signal at the intersection of Main Street and Central Avenue should be back in place soon. At the Oct. 6 work session of borough council, Louis Rachiele, borough manager, reported that the parts have arrived and are being powder coated. The signal should be replaced and operational within a week or two.
binghamtonhomepage.com
Vestal residents concerned about potential new gas station
VESTAL, N.Y. (WIVT/WBGH) – Vestal residents are voicing concerns about a proposed new gas station in the town. A permit has been filed to build a gas and service station at the former location of the Vestal Motel on the Vestal Parkway. The permit is currently being considered by...
14850 Magazine
Expect delays on North Meadow Street in Ithaca’s west end beginning Sunday evening
The City of Ithaca says work to install a new sanitary sewer manhole and sewer line for the new pump station location will require crews to narrow traffic on North Meadow Street to one lane from Sunday evening until Thursday. [...]
WIVT News 34
Vestal residents concerned about potential new gas station
VESTAL, N.Y. (WIVT/WBGH) – Vestal residents are voicing concerns about a proposed new gas station in the town. A permit has been filed to build a gas and service station at the former location of the Vestal Motel on the Vestal Parkway. The permit is currently being considered by the Town Board. People who live […]
14850 Magazine
Lower Forest Home Bridge closed for repair on Thursday and Friday
The Forest Home Bridge between Judd Falls Road and Pleasant Grove Road is closed to all traffic on Thursday and Friday, October 1 and 2, from 7am-5pm, for contractor repair, according to a Tompkins SIREN alert from the Town of Ithaca. [...]
WETM 18 News
Coopers Plains I-86 East on-ramp to close for paving work
COOPERS PLAINS, N.Y. (WETM) – The New York State Department of Transportation has announced they will be temporarily closing the I-86 eastbound on-ramp in Coopers Plains to accommodate paving work. According to a release from the New York State Department of Transportation (DOT), the eastbound on-ramp to Interstate 86 at exit 42 in Coopers Plains […]