Batavia

Batavia, IL · Traffic & Transit
NBC Chicago
Streetsblog Capitol Hill
wjol.com
Weekend lane closures on eastbound I-80 in Joliet
IDOT announced today that bridge deck repairs and pavement patching on Interstate 80 between Houbolt Road and Richards Street, in Joliet, will require weekend lane closures. . Starting at 10 p.m. Friday, Nov. 13, lane closures are scheduled to take place on eastbound I-80, between Houbolt Road and Richards Street....
chronicleillinois.com
NBC Chicago
Trains.com
Streetsblog Capitol Hill
WGN News
southportcorridorchicago.com
Remember When? Southport’s Original CTA ‘L’ Station Before the 2008 Renovation
Before the modern entrance, elevators and longer platforms, the Southport “L” stop was a modest neighborhood station tucked beneath the elevated tracks. These historic photographs capture a Southport Avenue that longtime Lakeview residents may remember. Southport’s “L” dates back to 1907. Southport station opened May...
Trains.com
Amtrak marks start of Chicago Union Station platform project
CHICAGO — Heralding the project as a step forward for both convenience and accessibility, Amtrak today (Nov. 9) marked the start of work to give Chicago Union Station its first level-boarding platforms. The project, expected to take 30 months, will convert long-dormant platforms 30 through 38, which once accommodated mail handling for the Chicago post [...] Read More...
Trains.com
Amtrak Chicago maintenance facility assessment glosses over challenges: Analysis
CHICAGO — The Federal Railroad Administration’s assessment of the site where Amtrak seeks to build a new Chicago maintenance facility details a long list of environmental mitigation efforts that will be required at the now-dormant Union Pacific rail yard on the South Side. However, the document publicly posted Friday reflects Amtrak’s reliance on building where [...] Read More...
hoodline.com
evanstonroundtable.com
american-rails.com
Amtrak Chicago Platforms Are Moving Toward Level Boarding
Amtrak said in Chicago on November 9, 2026, that construction is underway soon for the first “level boarding” platforms at Chicago Union Station. The platforms will serve multiple tracks and will allow boarding without ramps, stairs or lifts. The project is $112 million and is planned for 30 months. Major construction work will begin by the end of this year.