Talmadge Memorial Bridge lanes to close indefinitely. What drivers need to know
The Georgia Department of Transportation is reducing bridge traffic to one lane on the Eugene Talmadge Memorial Bridge in each direction, starting Monday, Dec. 7, to begin maintenance. That day, the GDOT will install temporary barricades on the outermost lanes in both directions to establish safe work zones, so workers can remove the existing underdeck access platforms, according to a news release. The lane closures will be 24-hours a day, seven days a week. Additional work is expected to change the lane closure configurations as well as shut down the bridge to all traffic on weekends. GDOT will place portable message boards in South Carolina and in Georgia to alert drivers. “In future phases, motorists should expect modified traffic patterns and are encouraged to plan ahead, find alternative routes, allow extra travel time, and use caution when traveling through the work zone,” GDOT wrote in a press release. “Drivers are reminded to reduce speeds, remain alert, and follow all posted signage.” The bridge connects Jasper County, South Carolina to Savannah, Georgia over the Savannah River. GDOT plans to use a different cable system that could raise the bridge an additional 20 feet for container ships arriving at the Port of