Summerville

Summerville, GA · Traffic & Transit
takingthekids.com
WTVC
Marietta Daily Journal
Weekend lane and ramp closures on I-285 in Smyrna
Work crews for the Georgia Department of Transportation will install lane closures on Interstate 285 this weekend for a project along seven miles of I-285 from Collier Drive in Fulton County to Paces Ferry Road in Cobb County. These lane closures are related to the ongoing concrete slab reconstruction and rehabilitation project currently ongoing along the westside of the I-285 corridor. The work includes improvements to the roadway shoulder lanes, the concrete median, signage, guardrail and ATMS/ITS systems. Weather and onsite conditions permitting, these are the lane and ramp closures scheduled to begin at 9 p.m. on Nov. 13 until 5 a.m. on Nov. 16: I-285 southbound: Two right lanes closed between SR 280/South Cobb Drive (Exit 15) and SR 8/ DL Hollowell Parkway (Exit 12). The southbound entrance ramp to SR 8/ D L Hollowell Parkway will be closed to traffic. Roadside signs will direct approaching drivers to the detour route. I-285 northbound: Two right lanes closed between South Atlanta Road (Exit 16) and SR 280/South Cobb Drive (Exit 15). The northbound entrance ramp to South Atlanta Road (Exit 16) will be closed to traffic. Roadside signs will direct approaching drivers to the detour route. Note: Nov. 13-16 will
Axios Atlanta
Rough Draft Atlanta
Marietta Daily Journal
Smyrna seeks feedback on proposed Chattahoochee River pedestrian bridge
Smyrna is exploring the feasibility of a new pedestrian and bicycle bridge over the Chattahoochee River. The bridge would be located near Riverview Landing, between Interstate 285 and Highway 78, connecting Cobb and Fulton counties. It would be part of the 100-mile Chattahoochee RiverLands Trail vision by the Georgia Trust for Public Land. “The bridge could improve connections between existing and planned trail systems while creating new opportunities for recreation, mobility, and access to the river,” the survey reads. In October, officials cut the ribbon on a half-mile section of RiverLands Showcase Trail in Smyrna, which the bridge would tie into. The trail section, located at Riverview Landing in Smyrna’s Riverview Park, a 12-acre linear park along the Chattahoochee, completes the northern portion of the Cobb RiverLands Showcase Project. The showcase begins in Discovery Park, running through Riverview Landing to a trailhead across the Chattahoochee from Proctor Creek. As part of a feasibility study for the bridge, the survey seeks input on project priorities, potential uses and the role the bridge could play in the community. To take the survey, visit app.maptionnaire.com/q/3er4faf8a7ci . The survey and feasibility are being conducted by Kimley-Horn Consulting services. In May, Smyrna awarded the project