Soulsbyville

Soulsbyville, CA · Traffic & Transit
american-rails.com
The Sacramento Bee
Freeport Bridge to remain partially closed on weekdays through mid-December
The partial Freeport Bridge closure — initially set to wrap up next week — will be extended through mid-December, leaving the crossing inaccessible during the daytime on weekdays for another couple of weeks. The bridge, which connects South River Road near Clarksburg in Yolo County with Freeport Boulevard in Sacramento County, has been closed from 8 a.m. to 6 p.m. on weekdays since Nov. 2, so construction crews could repair the bridge deck. The work includes fixing structural welds along the bridge deck, work that cannot be performed overnight because of cooler temperatures and higher moisture levels. The Sacramento River crossing is open during early commute hours, at night and on weekends. The county Department of Transportation initially estimated the closure would last through Monday, but recent rains have slowed construction , according to the department. Multiple moisture-laden storms triggered by the Super El Niño have hit the area since construction started. The climate pattern’s influence is expected to grow over the coming months , according to previous Bee reporting. The new approximate final construction date is Dec. 18. Drivers traveling to and from Clarksburg, which is about 4 miles south of the bridge on the Yolo County side, can
Travel Agent
oaklandside.org
KOLO TV Reno
KDRV
CBS Sacramento
actionnewsnow.com
theaggie.org
New paid parking designations added to Downtown Davis lots
On Nov. 2, the City of Davis launched a new paid parking system in three parking lots across downtown. The affected parking lots include the F Street lot between Third and Fourth Streets, the G Street lot between Second and Third Streets and the Amtrak Station lot. These changes are part of an existing paid parking program, which included adding fees to the E Street Plaza lot in 2008.
CBS 8
Strong storm pounds Northern California