Brandon

Brandon, WI · Traffic & Transit
WFRV Local 5
The Post-Crescent
Richmond Street bridge over Interstate 41 to open Nov. 20
The Richmond Street diverging diamond interchange on the border of Appleton and Grand Chute will be open Nov. 20 in time for the morning commute, Wisconsin Department of Transportation announced Nov. 19. In addition to transforming the interchange from a traditional layout to the diverging diamond layout, which WisDOT says accommodates higher traffic volumes and increases safety, additional bike and pedestrian accommodations were added. How do I use a diverging diamond? Here are some tips from WisDOT on how to approach this type of interchange. It's the fourth in the Fox Cities, so most drivers have likely encountered one by now, but just incase: Following the signs, signals and pavement markings, drivers go through the first set of traffic signals and then cross to the left side of the roadway. Once on the left side of the roadway, all left turns onto the interstate are free flow, so vehicles do not stop. Vehicles going straight proceed through a second set of traffic signals and cross back to the right side of the road. Drivers looking to make a right turn onto the interstate will approach the interchange as they normally would. Bicycles and pedestrians cross traffic to a center pathway