Open in App
  • Local
  • U.S.
  • Politics
  • Crime
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • TAPinto.net

    I-80 Lane Closures in Roxbury as Bridge Project Advances

    By TAPinto Roxbury,

    15 days ago

    https://img.particlenews.com/image.php?url=1z520N_0snKfdty00

    Credits: NJDOT/TAPinto Roxbury

    ROXBURY, NJ - Lane closures on Route 80 westbound will occur tonight through mid-morning on Saturday as construction crews gear up to replace the highway's bridges over Howard Boulevard, said the state Department of Transportation (DOT).

    It said the closures will begin at about 8 p.m. tonight, (Friday, May 3) and continue until about 10 a.m. May 4. The center and right lanes on Route 80 westbound are scheduled to be closed beginning near milepost 32 until past the bridge over Howard Boulevard, said the DOT.

    CLICK HERE TO SIGN UP FOR THE FREE TAPINTO.NET NEWSLETTER

    "At least one lane will be maintained overnight," said the state. "The closure is necessary to install a construction barrier and re-stripe the roadway to implement a traffic shift."

    The DOT said that three westbound lanes of the interstate will be restored and shifted to the right, using the shoulder as a travel lane, by 10 a.m. Saturday.

    "A temporary bridge is being constructed between the existing eastbound and westbound bridges to maintain three lanes of traffic in each direction throughout construction," explained the state. "When it is completed later this summer, eastbound traffic will be shifted onto the temporary median bridge to allow for the demolition and reconstruction of the I-80 eastbound bridge over Howard Boulevard."

    The $65.4 million project, funded by the federal government, entails replacing the existing bridges carrying Route 80 over Howard Boulevard. The current bridges "are in poor condition," said the DOT.

    DOWNLOAD THE FREE TAPINTO APP FOR MORE LOCAL NEWS. AVAILABLE IN THE APPLE STORE AND THE GOOGLE PLAY STORE .

    "Improvements will include raising the vertical clearance of each bridge, widening the shoulders, lengthening acceleration and deceleration lanes on I-80 and widening the ramps to and from Howard Boulevard," it noted. "The Howard Boulevard intersection will be reconfigured to improve operational performance."

    Additionally, the project will include upgraded traffic signals and lighting, said the state. It said ADA-compliant sidewalks and crosswalks will be built, with sidewalks extended to the NJ Transit Mount Arlington Train Station for improved pedestrian and bicycle safety and mobility.

    The project is expected to be complete in summer 2027, the DOT said.

    "The precise timing of the work is subject to change due to weather or other factors," it stressed. "Motorists are encouraged to check NJDOT’s traffic information website www.511nj.org for construction updates and real-time travel information."

    Don’t miss any Roxbury news! Click here to sign-up for our free daily e-newsletter.

    Please “like” and “follow” us on Facebook and check out our Twitter feed .

    TAPinto Roxbury is free to read, funded entirely by business advertising.

    To get your business in front of thousands of readers in Roxbury and beyond, become a TAPinto sponsor! Call 862-259-2448.

    To send press releases, classified ads, items for the event calendar, “Milestones” announcements, etc., look for the “Submit Content” link on the homepage.

    Thank you for reading TAPinto Roxbury!

    For more local news, visit TAPinto.net

    Expand All
    Comments / 0
    Add a Comment
    YOU MAY ALSO LIKE
    Most Popular newsMost Popular

    Comments / 0