Elizabethtown

Elizabethtown, IN · Traffic & Transit
wslmradio.com
Speed limit to be reduced on State Road 46 in Bloomington
He Indiana Department of Transportation (INDOT) is scheduled to reduce the speed limit on State Road 46 on or after Tuesday, October 20, in Bloomington. The speed limit will be reduced from 45 mph to 40 mph between just east of S.R. 446 and just east of Bender Road. The change is being made to enhance safety and improve overall traffic flow in the area.
wbcl.org
Major Traffic Changes to Begin at Olio Road and Southeastern Parkway Roundabout in Fishers
IMPORTANT: NEW TRAFFIC PATTERNS BEGIN MONDAY NIGHT. Beginning at 9 p.m. Monday, October 26, the roundabout will transition to the Phase 2 traffic configuration, bringing significant changes to how drivers travel through the intersection. Drivers should plan ahead and review the Phase 2 detour map for alternate routes before traveling...
bloomingtonian.com
Bloomington Transit warns of possible cuts if $3.8 million in tax support is not preserved
BLOOMINGTON, Ind. — October 26, 2026. Bloomington Transit could face service and staffing cuts if $3.8 million in annual local income-tax support is not preserved under Indiana’s revised tax system taking effect in 2029, agency representatives told Monroe County officials Friday. James McClary, chair of the Bloomington Public...
Indiana Daily Student
PRESS RELEASE: South Liberty Drive Resurfacing to Bring Overnight Lane Restrictions Oct. 29–30
The following is a press release written by Desiree DeMolina for the City of Bloomington. The City of Bloomington will resurface South Liberty Drive from West Third Street to the end of the City-maintained roadway on Thursday, Oct. 29, and Friday, Oct. 30, weather permitting. The work will take place overnight from 7 p.m. to 3 a.m. and will be performed by Milestone Contractors as part of the City’s annual pavement maintenance program.
WTHR
Fishers roundabout closure creates obstacle for drivers who travel on Olio Road often
qmix.com
readthereporter.com
Next phase of Olio Road & Southeastern Parkway roundabout project begins Monday
Beginning at 9 p.m. Monday, Oct. 26, the roundabout will transition to the Phase 2 traffic configuration, bringing significant changes to how drivers travel through the intersection. Drivers should plan ahead and review the Phase 2 detour map for alternate routes before traveling through the area. Phase 2 traffic changes.