Dickens

Dickens, TX · Traffic & Transit
KCBD
Road work to limit access on MLK Jr. Boulevard starting Monday
LUBBOCK, Texas (KCBD) - A contractor working for the City of Lubbock Public Works Department will replace a broken water valve at the intersection of 66th Street and Martin Luther King Jr. Boulevard starting Monday, Aug. 31, 2026. Traffic along MLK Jr. Boulevard from Slaton Highway to 50th Street will...
KCBD
Citibus to launch new, redesigned routes Sept. 28
LUBBOCK, Texas (KCBD) - Citibus will launch Phase One of its approved 5-Year Service Plan on Monday, Sept. 28, introducing one new route and three redesigned routes. The plan was adopted in November 2024. The updated routes incorporate and streamline portions of existing routes. Phase One includes the following routes:
fox34.com
Citibus to launch new, redesigned routes Sept. 28
LUBBOCK, Texas (KCBD) - Citibus will launch Phase One of its approved 5-Year Service Plan on Monday, Sept. 28, introducing one new route and three redesigned routes. The plan was adopted in November 2024. The updated routes incorporate and streamline portions of existing routes. Phase One includes the following routes:
fox34.com
TRAFFIC ALERT: Traffic backed up on Loop 289 from Marsha Sharp Frwy. to Slide Rd.
LUBBOCK, Texas (KCBD) - Crews are responding to a crash on West and South Loop 289. It has southbound/eastbound traffic backed up from Slide Road to the Marsha Sharp Freeway. This report is just after 6 p.m. Lubbock Police report no serious injuries.
fox34.com
TxDOT road repairs on FM 179 to close stretch of Lubbock roadway this week
LUBBOCK, Texas (KCBD) - The Texas Department of Transportation is making road repairs to FM 179 between 4th Street and 19th Street that may affect commuters this week and next. FM 179 will be closed to traffic during operations but will reopen between the two phases. Drivers should avoid the...
fox34.com
Paving operations scheduled for FM 179
LUBBOCK (TxDOT) - The Texas Department of Transportation is scheduled to make road repairs to FM 179, from 4th Street to 19th Street in Lubbock, starting next week. Phase 1 operations to mill and resurface the segment of FM 179, from 19th Street to 10th Street, are scheduled to take place Tuesday through Thursday (Aug. 11-13). Phase 2 repairs, from 10th Street to 4th Street, are scheduled for Aug. 17-18. FM 179 will be closed to traffic during operations, but will reopen between the two phases. Drivers will need to seek an alternate route. Messages boards are in place alerting drivers of the planned work.
mix100lubbock.com
Citibus to Launch First Phase of Five Year Service Plan Beginning September 28
Citibus is pleased to announce the launch of Phase One of its approved 5-Year Service Plan, adopted in November 2024. This first phase introduces one brand-new route and three redesigned routes that incorporate and streamline portions of existing routes, resulting in a more efficient and connected network for riders. The updated route network will begin operating on Monday, September 28, 2026.
KCBD
Roadwork on West Loop Frontage Road Expected to Slow Down Commuters
LUBBOCK, Texas (KCBD) - Commuters on the West Loop frontage road should prepare for delays and lane closures starting tomorrow morning as repaving crews begin work. The project will affect southbound traffic on the frontage road between North Utica Avenue and Winston Avenue. During construction, the frontage road’s left lane and the southbound West Loop exit ramp to Slide Road and 4th Street will be completely closed.
KCBD
Citibus to launch new and redesigned routes in September
LUBBOCK, Texas (KCBD) - Citibus will launch Phase One of its approved 5-Year Service Plan on Monday, Sept. 28, introducing one new route and three redesigned routes across the city. The plan was adopted in November 2024. The changes are designed to improve connections to neighborhoods, jobs, schools, healthcare and...
KAMC KLBK EverythingLubbock.com
Citibus to launch first phase of five year service plan
The above video shows the top local headlines for the morning of August 4, 2026. LUBBOCK, Texas – Citibus announced the official launch of Phase One of its approved 5-Year Service Plan, adopted in November 2024. This first phase introduces one brand-new route and three redesigned routes that incorporate and streamline portions of existing routes, […]