Dickens

Dickens, TX · Traffic & Transit
Awesome 98
Lubbock Kids Could Be Waiting At Bus Stops 90 Minutes Before Sunrise Under Permanent Daylight Saving Time
If permanent daylight saving time becomes law, winter sunrises in Lubbock would shift to nearly 9 a.m. — meaning elementary students would already be in class before the sun comes up.
93.1 KISS FM
Lubbock Kids Could Be Waiting At Bus Stops 90 Minutes Before Sunrise Under Permanent Daylight Saving Time
If permanent daylight saving time becomes law, winter sunrises in Lubbock would shift to nearly 9 a.m. — meaning elementary students would already be in class before the sun comes up.
KAMC KLBK EverythingLubbock.com
City Council approves $150k grant for railcar company silenced by County Commissioners
The Lubbock City Council approved a $152,000 grant from the Lubbock Economic Development Alliance to assist TTX Company with a gas line extension for its expanding railcar repair facility in Slaton.
KCBD
Woodrow Rd. lane closure impacts south Lubbock drivers this week
LUBBOCK, Texas (KCBD) - Drivers in south Lubbock may experience delays this week as crews begin work along Woodrow Rd. The area from Indiana Ave. to US 87 is closed to allow crews to widen the roadway from two lanes to five. The project is expected to be completed by the weekend, weather permitting.
KCBD
TxDOT seeks public input on $95B, 10-year Texas transportation plan
KAMC KLBK EverythingLubbock.com
$14.8M project to rebuild Upland Avenue in Lubbock
The Texas Department of Transportation will begin construction on a $14.8 million project to rebuild Upland Avenue in Lubbock, Texas, from a two-lane roadway to a five-lane thoroughfare, with an anticipated completion date of spring 2028.
fox34.com
Side street closure planned for Woodrow Road project to start Monday
LUBBOCK, Texas (KCBD) - (News release from the Texas Department of Transportation) Beginning Monday, July 6, access to Woodrow Road (CR 7600) from CR 2130 will be temporarily closed. The closure will allow crews to continue to make road improvements to Woodrow and is expected to be in place through Friday, July 10.
KCBD
$14.8m project to make major improvements to Upland Avenue
LUBBOCK, TX (NEWS RELEASE) – The Texas Department of Transportation is set to begin work on a project that will make major improvements to Upland Avenue, from 82nd Street to just south of 98th Street, in Lubbock. The $14.8 million, city of Lubbock project will completely rebuild the existing roadway from a two-lane roadway to a five-lane thoroughfare.
KCBD
Wolfforth sealcoat project to close multiple streets Tuesday and Wednesday
WOLFFORTH, Texas (KCBD) - Wolfforth’s 2026 sealcoat project will begin Tuesday, and complete Wednesday. The project will renew the life of asphalt surfaces and improve safety and aesthetics in the community. The following roadway sections are part of the 2026 sealcoat program:. Donald Preston Drive from Cambridge Avenue west...
KCBD
TxDOT holds meeting about South Loop 289 & Slide bridge project
LUBBOCK, Texas (KCBD) - TxDOT held a public meeting Thursday evening to discuss a plan to replace bridges along the South Loop. The project will replace the two bridges of South Loop 289 over Slide Road and turn them into one bridge structure. The bridges were built in the 1970s and have reached their lifespan, according to TxDOT.
Chron.com
KAMC KLBK EverythingLubbock.com
Lubbock invited to comment on Loop 289 bridge proposal
The above video shows the top local headlines for the morning of June 15, 2026. LUBBOCK, Texas — The Texas Department of Transportation (TxDOT) invites citizens to attend a public meeting to view information on a proposed project to rebuild the South Loop 289 bridge at Slide Road. This public meeting will be held from […]
KAMC KLBK EverythingLubbock.com
Loop 289 resurfacing repairs scheduled to begin June 11
The above video shows the top local headlines for the morning of June 10, 2026. LUBBOCK, Texas — Starting tomorrow morning, June 11, TxDOT is scheduled to begin pavement repairs to the west Loop 289 southbound frontage road, between 26th and 34th Streets. Milling and resurfacing the inside frontage road lane are expected to take […]