Buchanan

Buchanan, GA · Traffic & Transit
Marietta Daily Journal
All lanes closed on I-285 this weekend between SR 280/S. Cobb Drive and Paces Ferry Road
Work crews for the Georgia Department of Transportation will close all lanes on Interstate 285 northbound and southbound between SR 280/S Cobb Drive and Paces Ferry Rd in the cities of Atlanta and Smyrna this weekend from 7 p.m. on Nov. 13 until 5 a.m. on Nov. 16. All traffic approaching the closures will be detoured to use I-75, I-75/I-85 Connector and I-20. The full closure is related to the I-285 Westside Rebuild concrete slab reconstruction and rehabilitation project currently ongoing from Collier Drive in Fulton County to Paces Ferry Road in Cobb County. The work includes improvements to the roadway shoulder lanes, the concrete median, signage, guardrail and ATMS/ITS systems. Weather and onsite conditions permitting, these are the scheduled closures: I-285 northbound: All lanes closed to traffic between S. Atlanta Road (Exit 16) and S. Cobb Drive (Exit 15).I-285 southbound: All lanes closed to traffic between Paces Ferry Rd (Exit 18) and S. Cobb Drive (Exit 15). Crews will be milling/grinding the roadway concrete in preparation to repair or replace the concrete slabs through the project area. Lane closures are necessary to provide sufficient space for crews to work safely and to protect motorists while large equipment is in
fox5atlanta.com
atlantanewsfirst.com
streetz945atl.com
atlantanewsfirst.com
fox5atlanta.com
fox5atlanta.com
fox5atlanta.com
News 12
Axios Atlanta
Can Atlanta squeeze a new MARTA station onto the Beltline?
Atlanta Beltline officials are studying whether a proposed station near Adair Park could become MARTA's first new heavy-rail stop in more than 25 years. Why it matters: If built, the Murphy Crossing infill station along the Southwest Trail could be the first rail station that connects with the Beltline trail and the long-debated rail line envisioned for it. Zoom in: The proposed station would be built between MARTA's West End and Oakland City stations and near the Beltline's planned 20-acre Murphy Crossing redevelopment of a former state farmers market property. How it works: Beltline principal engineer Shaun Green told residents at an Oct. 29 meeting not far from the proposed station's site that planners are evaluating five concepts. Options include building platforms alongside existing elevated MARTA tracks and rerouting the tracks to accommodate a new station. All would be significant construction projects. Yes, but: The area under consideration features a busy state highway, a city street, active freight lines and elevated MARTA train lines. Underneath the congested corridor there's the popular Beltline trail. "There's no way to fit this into the existing area without there being some [impacts]," Green said. Atlanta Beltline Inc., the nonprofit planning and building the Beltline,