Calimesa begins 5-year road repair plan
Calimesa is beginning work on a five-year plan for maintaining and repairing its roads, a shift city council and staff said could help the city stretch limited pavement funds while preventing streets in better condition from falling into disrepair. The city council discussed the long-term pavement strategy Nov. 16, while also putting its previously selected Avenue L rehabilitation project on hold because of continuing problems beneath the roadway. The city maintains about 44 miles of paved roads. According to pavement condition data collected by the city’s consultant, Vialytics, about 26% of those roads are in poor, very poor or serious/failed condition. Another 23% are classified as fair, meaning roughly half of the city’s road network is either in fair or worse condition. The Vialytics assessment divides Calimesa’s roads into six categories: 10.29 miles, or 23%, are rated good; 6.09 miles, or 14%, satisfactory; 10.23 miles, or 23%, fair; 5.78 miles, or 13%, poor; 6.21 miles, or 14%, very poor; and 5.56 miles, or 12%, serious or failed.