24K

Posts

16K

Followers

Local 4 WHBF
Website

The latest Quad Cities news, weather and sports from Local 4 WHBF on https://OurQuadCities.com.

ourquadcities.com

Muscatine

Muscatine residents invited to give feedback on Isett Avenue Corridor

By Linda Cook,

16 hours ago

https://img.particlenews.com/image.php?url=32HsBo_1Fvn6qUK00

The City of Muscatine is inviting residents to attend a public open house and share their thoughts on the preliminary design for the Connect Isett Project, a reconstruction project of Isett Avenue and Cypress Street, a news release says.

The open house will take place from 4:30-6:30 p.m. Thursday, Oct. 22, at the Musser Public Library, 408 E. 2nd St., Muscatine. All Muscatine residents and travelers on Isett Avenue are invited. In addition to the open house, residents are asked to share their comments on the project and complete a survey to indicate design preferences.

If you are unable to attend the open house information and survey can be found on the city’s website here.

Connect Isett is a city project focused on roadway improvements for 1.7 miles of the Isett Avenue corridor from Isett Avenue and U.S. Highway 61 to Cypress and East 5th Streets. Isett Avenue is an important north-south corridor through the city that serves as a crucial link for businesses and residents and is a gateway to the Muscatine community. These improvements include enhanced safety, improved lane and intersection configurations, bridge improvements, enhanced aesthetics and overall improved facilities.

Prior to design, the city collected data on traffic volume and flow through the corridor, conducted field studies to gain a better understanding of the natural and built environment, and collaborated with stakeholders located near the corridor. Project planning, environmental review, and design are funded through a $2 million federal Rebuilding American Infrastructure with Sustainability and Equity grant from the U.S. Department of Transportation. The grant funds design activities only.

Construction funding has not yet been secured. The city is evaluating potential local, state, regional, and federal funding opportunities for future construction phases. The project is currently in design, which is expected to continue into 2027. Construction will occur in phases after construction funding is secured. Specific construction dates have not yet been established.

To learn more about the project, complete the survey, and stay up to date, visit here. For those without internet access, information on the project can obtained by contacting the city offices at 215 Sycamore St., Muscatine, or by calling 563-264-1550.

Copyright 2026 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

For the latest news, weather, sports, and streaming video, head to WHBF - OurQuadCities.com.

Comments

YOU MAY ALSO LIKE