Open in App
  • Local
  • U.S.
  • Election
  • Politics
  • Sports
  • Lifestyle
  • Education
  • Real Estate
  • Newsletter
  • WWL-AMFM

    90% of NOLA pumps operational

    By Chris Miller,

    22 days ago

    https://img.particlenews.com/image.php?url=1kpxb6_0vShGstr00

    The man in charge of the New Orleans Sewerage & Water Board says he's feeling good, all things considered, as Hurricane Francine sets up for landfall later today.

    The agency responsible for pumping out the rainwater reports it can make 70 megawatts of power. That's 26 megawatts more than what they would need at full capacity. Ninety out of 99 drainage pumps are fully operational.

    On a scale of one to ten, in terms of confident, Sewerage & Water Board Executive Director Ghassan Korban says he's about an eight.

    "I'm fairly confident," he told WWL's Tommy Tucker. "The team sounds very confident. They've been preparing. They continue to tweak, so we're really feeling very good about our position."

    Korban's silver lining is that Francine is gaining forward speed and is not expected to set up over the area and dump 12 or more inches of rain.

    "What we're hearing is that we're going to have an intense rain on the front end of it in the evening, anywhere from four to six (inches), anywhere as high as eight," said Korban.

    "The worst storms are the ones that hover over you and dump ten to 12 inches of rain," Korban said.

    Expand All
    Comments / 2
    Add a Comment
    Weedy
    22d ago
    they're never at a 100%
    Ronald Rodas
    22d ago
    they lying 90% of SWB high asf and asleep somewhere
    View all comments
    YOU MAY ALSO LIKE
    Local News newsLocal News
    WWL-AMFM9 days ago
    Robert Russell Shaneyfelt42 minutes ago

    Comments / 0