undefined

Posts

undefined

Followers

User since undefined NaN
Wilson County

Board makes way for major Sims development

By Christopher Long,

6 hours ago

https://img.particlenews.com/image.php?url=2bVZPi_1HCnNFGM00

WILSON — The Wilson County Planning Board unanimously approved a conditional rezoning during the Monday, Nov. 16, meeting that would make way for a shopping center near Sims.

The property owner, VALCO Renewables LLC, requested that the property located off of U.S. Highway 264 Alternate near Sims be rezoned from light industrial to a conditional general business district. The county staff report on the project states, “The conditional nature of this rezoning would allow multiple uses within a commercial district while ensuring compliance with applicable county ordinances and maintaining the health and safety of surrounding properties.”

According to a preliminary plat submitted to the county, the new shopping center would consist of three multi-family residential housing developments, three retail strips, three fast food restaurants, a coffee shop, a convenient store/gas station, a four-story hotel and a grocery store.

“This is a concept plan,” said Brad Thompson, director of development services for the county. “Things can move around, but I feel like a grocery store would be a good component here.”

The 36.56-acre property was formerly a wood chip mill, which has been out of business for about a decade, according to Thompson, and is across the road from Mill Stone Way and Medford Drive subdivisions.

Thompson said that improvements for U.S. Highway 264 Alternate would be required for the project to move forward.

“The preliminary plan shows five entrances along 264,” Thompson said. “DOT is actually asking to reduce that count. The main entrance should align with Mill Stone Creek, which is the subdivision across the street. A traffic signal may be required at that entrance. Right turn lanes and left center turn lanes need to be constructed at the main entrance.”

Thompson said the development should incorporate a cohesive design throughout to give a unified appearance and would be required to maintain a two-to-one ratio of full service restaurants versus fast food restaurants.

Robert Bartlett of Bartlett Engineering appeared before the board and said that the applicant agreed with all of the conditions except the two-to-one ratio of restaurants. Bartlett said a one-to-one restaurant would be more reasonable and called the two-to-one ratio unreasonable.

“We feel that’s a little specific at this point in the development and a little restrictive for what may be appropriate at this time,” he said. “We certainly understand the concerns. Nobody wants to see one gas station and convenient mart and two or three fast foods pop up out there and it sit there for 10 years before anything else happens. The property owner doesn’t want to see that happen.”

Board members changed the condition from a two-to-one ratio to one-to-one. Board members also came to an understanding that a fence needed to go around the stormwater pond on the property as well as paved access to the pond for firefighting.

PROPERTY EASEMENTS

Vickie Brock, who owns property on Old Davis Road behind the acreage proposed for rezoning, came before the board to say that she is not against development or growth in the area, but the area is her home.

“My sole purpose for coming here tonight is to make the record clear that I do have an easement as-is across that property as-is,” Brock said. “That easement is recorded and it is in the Register of Deeds. I’ve got that book number. When Canal Woodchip went in there, my parents sold this property, and the original negotiation was that an easement would take place. I want to be able to make sure that I can maintain easement because my son lives in a house that is there in what we consider our homeplace.”

Brock said that she went to court over the issue in 2014. She said the house on the property is only accessible through the easement on the property.

“We have letters from the local fire departments in Sims and Bailey who had offered letters saying we needed to maintain access to that property,” Brock said. “In the event of an emergency, we need to maintain access to that property. I’m a friend of the growth. I welcome this out here in the Sims community. I’ve never been objective to it at all. I just want to maintain access to my property.”

Bartlett said he and the property owner were aware of the easement and would respect it. He said it would be appropriate to add the easement as a condition of the rezoning.

“As this develops, as it’s all said and done, there will be an improved means to access there,” Bartlett said. “This property owner, developer, has no way to control over that.”

The final approval required a measure that Brock have access to the property through all phases of development.

Comments