undefined

Posts

undefined

Followers

User since undefined NaN
Toledo

Editorial: Build bypass now for time, gas savings

By THE BLADE EDITORIAL BOARD,

2026-10-08

https://img.particlenews.com/image.php?url=0cyz7w_1FuMCKsV00

To offer an obvious transportation-related metaphor, the report from the state Department of Transportation on the feasibility of a U.S.23/​I-71 Connector is a green light.

The timeline of the proposed project, however, is far too slow. Waiting until 2035 to begin construction is an unwise delay in a long-needed highway to speed up access from Toledo to the state capital region.

Read more editorial

To be sure, big money is involved — about $1 billion — to bypass the multiple traffic signals and growing congestion on U.S. 23 in Delaware County. The Connector Feasibility Study predicts a $6 to $1 return on investment from a highway beginning north of Waldo, Ohio, and slanting southeast to I-71. The biggest benefit is to life itself as decreased crashes provide most of the benefit. Trucks from Toledo won’t have to operate in stop and go traffic on U.S. 23. The savings in time and fuel consumption contribute still more economic benefit.

Ohio’s new governor, whether Republican Vivek Ramaswamy or Democrat Amy Acton, must prioritize ODOT projects based on their economic impact.

Few will have as much benefit to the overall state economy as the first commercially viable highway connection between Toledo and Columbus in Ohio history.

The ODOT study has produced such good news it should not wait until 2035 to be acted on. There’s no time like the present for the Toledo to Columbus connection.

Comments