undefined
Posts
undefined
Followers
User since undefined NaN
Temporary Closure of River’s Edge Trail, North River Road at Black Eagle Dam for Construction Work
By Jo Dee Black, NorthWestern Energy,
2025-09-04Both the River’s Edge Trail on the north shore and North River Road near Black Eagle Dam will be closed Thursday, Sept. 4. The closures are needed so crews can safely use heavy equipment to pour concrete and transport support structures as part of the Black Eagle Dam Spillway Project.