This is an archived article and the information in the article may be outdated. Please look at the time stamp on the story to see when it was last updated.

KANSAS CITY, Mo. — This week, more than $1.2 million in grant funds was awarded to 15 Kansas City area “Planning Sustainable Places” projects.

The Mid-America Regional Council Board of Directors and Total Transportation Policy Committee approved the allocation of $1,228,500 in grant funds for six projects in Kansas and nine in Missouri that will advance the creation of sustainable places in the area.

The projects were chosen through a competitive process from 23 total submissions.

The PSP program aims to further the creation of “vibrant places that offer a mix of options for housing, jobs, services and recreation. Connected places with a variety of transportation options and green places that support healthy living and a healthy natural environment.

The following is a list of the 15 projects across the Kansas City area.

Kansas City, Missouri

Multicounty Regional Bike/Ped Highway Barrier Removal Project — a connectivity study to connect existing trail systems in Platte and Clay counties. Awarded $100,500.

Southwest Boulevard Transportation Study — a community-driven transportation study for Southwest Boulevard from Broadway to 31st Street. Awarded $135,000.

Vine Street with Greenline Connector — a complete street and connectivity study for the Vine Street corridor from 18th to 31st streets. Awarded $135,000.

Independence, Missouri

  • Independence Transportation for All Plan — a citywide multimodal transportation plan. Awarded $74,250.

Overland Park, Kansas

  • College and Metcalf Overlay District — a new flexible zoning overlay district that addresses the relationship between transportation and land use in a key commercial corridor. Awarded $50,000.
  • 79th Street Corridor Study — a multimodal plan for the 79th Street corridor with emphasis on safety and connectivity to existing destinations. Awarded $100,000.

Grandview, Missouri

  • Harry Truman Drive and Presidential Trail Enhancement — a multimodal plan for Harry Truman Drive and the Presidential Trail. Awarded $56,000.

Mission, Kansas

  • Rock Creek Corridor Improvements: Downtown Center to East Gateway — a plan for improvements to the Rock Creek Trail corridor. Awarded $80,000.

Parkville, Missouri

  • Parkville ADA Transition Plan — Awarded $20,000.

Bonner Springs, Kansas

  • Bonner Springs Downtown Master Plan — a multimodal plan that integrates an existing trail system and transit services. Awarded $60,000.

North Kansas City, Missouri

  • Riverfront Levee Trail — a feasibility study for a mixed-use trail on the North Kansas City levee system. Awarded $54,000.

Port KC

  • Berkley Riverfront Connectivity Study — a planning and connectivity study for the Berkley Riverfront area of Columbus Park in Kansas City, Missouri. Awarded $135,000.

Westwood, Kansas

  • Rainbow Boulevard/7th Street/Highway 169 Complete Street Traffic Management Plan — conceptual design development for Rainbow Boulevard and four key commercial intersections. Awarded $118,500.

Osawatomie, Kansas

  • OZ Commons: Community Hub — a plan for the development of a multimodal community hub in downtown Osawatomie. Awarded $80,000.

📲 Download the FOX4 News app to stay updated on the go.
📧 Sign up for FOX4 email alerts to have breaking news sent to your inbox.
💻 Find today’s top stories on fox4kc.com for Kansas City and all of Kansas and Missouri.