Hawthorne Bridge closes for weekend inspections, maintenance work

TriMet bus line 14 will detour for the weekend closure of the Hawthorne Bridge. Check TriMet.org/alerts for info. Oregonian file photo.

Portland’s Hawthorne Bridge will close to all traffic including vehicles, bicyclists, and pedestrians this weekend for planned inspection and maintenance work.

The closure hours are 6 a.m.-6 p.m. Saturday-Sunday, July 16-17. Contractors will be conducting a survey and inspecting the bridge. Sunday’s work will include the greasing of the bridge’s counterweight cables.

Alternate bridges for detours include the Morrison, Burnside, and Steel. Bicycle and foot traffic can also use Tilikum Crossing. The Hawthorne will still lift for river traffic, if needed.

TriMet bus routes 4 and 14 will need to detour. Check TriMet.org/alerts for details.

Multnomah County maintains the Hawthorne Bridge as well as five other Willamette River bridges. For information visit: multco.us/bridges

Follow us on Twitter for the latest in commuting news: @trafficportland

If you purchase a product or register for an account through a link on our site, we may receive compensation. By using this site, you consent to our User Agreement and agree that your clicks, interactions, and personal information may be collected, recorded, and/or stored by us and social media and other third-party partners in accordance with our Privacy Policy.

X

Opt out of the sale or sharing of personal information

If you opt out, we won’t sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.