Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:

Carbon County

• Penn Forest: Hatchery Road pothole patching between Route 903 and Pohopoco Road, 7 a.m. to 3 p.m. Tuesday through Friday.

• Kidder Township: Route 940 pothole patching between Route 476 and Monroe County line, 7 a.m. to 3 a.m. starting on Friday and ending near July 27.

Lehigh County

• Upper Macungie and South Whitehall townships, city of Allentown: Route 22 construction between I-78 and 15th Street, 7 p.m. to 6 a.m. Tuesday through Saturday.

• Whitehall Township: Route 22 milling and paving between 15th Street and Route 145/MacArthur Road, 7 p.m. to 6 a.m. Friday through Saturday.

• Various townships: I-78 construction between Exit 49 (Route 100) and Exit 54 (Route 222), 9 p.m. to 6 a.m. Tuesday through Saturday.

• Washington Township: Mountain Road bridge repair between Brown Street and Deer Road, 8 a.m. to 2 p.m. Tuesday through Friday.

• Various townships: I-78 highway beautification between Exit 49 (Route 100) and Northampton County line, 8 a.m. to 2 p.m. Tuesday through Friday.

• Whitehall Township: Route 22 highway beautification between Route 145 and I-78, 9 a.m. to 2 p.m. Tuesday through Friday.

• Various townships: I-78 highway beautification between Exit 49 (Route 100) and Northampton County line, 9 a.m. to 2 p.m. Tuesday through Friday.

Monroe County

• Stroud Township: Poplar Valley Road crack sealing between Old Route 115 and Route 191, 7 p.m. to 5 a.m. Tuesday through Friday.

Northampton County

• Various townships: I-78 construction between Exit 67 and Exit 75, 7 p.m. to 6 a.m. Tuesday through Saturday.

Schuylkill County

• West Penn Township: Route 309 milling and paving between Mill Drive and Overlook Drive, 6 a.m. to 3 p.m. Tuesday through Friday.

• Ryan, Blythe, and Mahanoy townships: Burma Road pothole patching between St. Clair Borough and Morea Road, 7 a.m. to 3 p.m. Tuesday through Friday.

• Mahanoy, Ryan and Blythe townships: Route 54 milling and paving between Mahanoy City and I-81, 6 a.m. to 4 a.m. from Tuesday until Friday.