Major Roadwork Scheduled Friday, June 24 Through Thursday, June 30

Road Work Ahead Public Works BlurPress release from Caltrans:

The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN. For media updates, please contact the appropriate Public Information Officer listed above.

Del Norte County

U.S. 101 (4.6/6) – Construction work from the Route 169 junction to north of Klamath will conclude on Friday, June 24. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate 10-minute delays. LC#C101HB

U.S. 101 (8.3/8.6) – Bridge work north of Klamath near Old Hunter Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C101KB

U.S. 101 (14.9/22.7) – Construction in the Last Chance Grade area will continue. One-way traffic control will be in effect. Motorists should anticipate 25-minute delays at all hours. LC#C101FA and C101OC

U.S. 101 (39.6/46.5) – Construction work near Rowdy Creek to the Oregon State Line will conclude on Friday, June 24. One-way traffic control will be in effect weekdays. Motorists should anticipate 20-minute delays between 7 a.m. and 7 p.m. LC#C101WB

U.S. 199 (1.2/1.6) – Construction work near Kings Valley Road will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. weekdays. Motorists should anticipate 10-minute delays. LC#C199CA

U.S. 199 (4.2/4.4) – Bridge work at Hiouchi Bridge will continue. One-way traffic control will be in effect from 6 a.m. to 4 p.m. weekdays. Motorists should anticipate minor slowdowns. LC#C199BA

U.S. 199 (10.7) – Permitted cleanup and repair work between Hiouchi and Gasquet will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#P199BA

U.S. 199 (11.9/12.2) – Bridge work from Mary Adam Peacock Bridge to Wagon Wheel Cafe will continue. One-way traffic control will be in effect weekdays. Motorists should anticipate minor slowdowns. LC#C199BA

Humboldt County

 

Route 36 (0/1.6) – Utility work will occur from Alton to Wolverton Gulch on Tuesday, June 28. One-way traffic control will be in effect from 8 a.m. to 6 p.m. Motorists should expect 5-minute delays. LC#P36BA

Route 36 (10/10/3) – Utility work will occur from Church Lane to Johnson Lane on Tuesday, June 28. One-way traffic control will be in effect from 8 a.m. to 12 p.m. Motorists should expect 5-minute delays. LC#P36BA

Route 36 (10.3/11.5) – Construction work from Johnson Lane to Hely Creek Bridge will continue. One-way traffic control will be in effect weekdays from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays. LC#C36VA

Route 36 (0/1.6) – Utility work will occur west of Dinsmore on Tuesday, June 28. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P36BA

Route 96 (16.8/23.1) – Crack sealing operations south of Weitchpec will begin on Monday, June 27. One-way traffic control will be in effect weekdays from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays. LC#C96BA

Route 96 (25.2/37.3) – Construction work south of Orleans will continue. One-way traffic control will be in effect weekdays from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays. LC#C96IA

Route 96 (27.6/29.9) – Maintenance work will occur from Slate Creek to Bluff Creek Road on Friday, June 24. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#M96JA

U.S. 101 (17.9) – Bridge work south of Phillipsville will continue. Lane closures will be in effect weekdays. Motorists should anticipate minor traffic slowdowns. A northbound onramp closure will also be in effect. Motorists should use an alternate route. LC#C101FB

U.S. 101 (27.7/27.9) – Bridge work near Myers Flat will begin on Friday, June 24. Lane closures will be in effect weekdays from 6 a.m. to 8 p.m. A full on ramp closure will be in effect beginning Wednesday, June 29. Motorists should anticipate minor traffic slowdowns. LC#C101CF

U.S. 101 (35.7) – Bridge work at the Route 101 South Fork Road Undercrossing continues. A full off ramp closure will be in effect from 6 a.m. to 4 p.m. Motorists should anticipate 10-minute delays. LC#M101QA

U.S. 101 (79.4/79.5) – Utility work will occur in Eureka from V Street to X Street on Monday, June 27. Lane closures will be in effect overnight from 7 p.m. to 6 a.m. Motorists should expect minor slowdowns through the area. LC#C101DB

U.S. 101 (87.5/89.6) – Construction from the St Louis Road Overcrossing to Mad River Bridge will continue. Lane closures will be in effect from 8 p.m. to 6 a.m. Motorists should anticipate 10-minute delays. LC#C101PA and X101EA

U.S. 101 (88.2) – Utility work in Arcata at Route 299 will continue. The on and off ramps will be closed from 9 p.m. to 5 a.m. weeknights. Motorists should anticipate 10-minute delays. LC#C101PA

U.S. 101 (93/109.6) – Construction work from Murray Road Overcrossing to Georgia Pacific Road will continue. One-way traffic control will be in effect weekdays from 7 a.m. to 7 p.m. Motorists should anticipate 10-minute delays. In addition, the following intermittent full ramp closures will be in effect: the School Road Overcrossing on and off ramps, the Murray Road Overcrossing on and off ramps, the Crannell Scale southbound on and off ramps overnight from 7 p.m. to 7 a.m. and the Westhaven Drive Undercrossing on and off ramps overnight from 7 p.m. to 7 a.m. Motorists should follow signage and use an alternate route when necessary. LC#C101CA

Route 255 (2.9/6) – Permitted utility work between Jackson Ranch Road and Peninsula Drive will continue. One-way traffic will be in effect from 7 a.m. to 6 p.m. weekdays. Motorists should anticipate 10-minute delays. LC#C255BA

Route 299 (1.8) – Construction near Route 200 will continue. Lane closures will be in effect from 7 a.m. to 5 p.m. weekdays. Motorists should expect minor traffic slowdowns. LC#C299CA

Route 299 (17.1/20.6) – Emergency tree work at Chezem Road will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. weekdays. Motorists should expect up to 15-minute delays. LC#C299MA

Route 299 (29.5/30.6) – Construction east of the Burney Vista Point will continue. Motorists should anticipate 5-minute delays. LC#C299AA

Route 299 (34.6/37.9) – Construction from Willow Creek to Old Three Creek Road will continue. One-way traffic control will be in effect weekdays. Motorists should anticipate 10-minute delays. LC#C299BA

 

Lake County

Route 20 (25.9/27) – Guardrail work in Clearlake Oaks at East Hillside Lane will conclude on Friday, June 24. One-way traffic control will be in effect from 7 a.m. to 5 p.m. weekdays. Motorists should expect up to 10-minute delays. LC#C20PA

Route 20 (35.9/37) – Utility work will occur from Gravel Plant Road to North Fork Cache Creek on Tuesday, June 28. Lane closures will be in effect from 7:00 a.m. to 5:30 p.m. Motorists should expect minor slowdowns through the area. LC#P20BA

Route 29 (11.9/14.8) – Road work near Hidden Valley Lake at Spruce Grove Road will conclude on Wednesday, June 29. One-way traffic control will be in effect from a.m. to 5 p.m. weekdays. Motorists should expect 10-minute delays. LC#C29UA

Route 29 (22.2) – Road work west of Lower Lake at Point Lakeview Road will conclude on Monday, June 27. One-way traffic control will be in effect from 6:30 a.m. to 5:00 p.m. Motorists should expect 5-minute delays. LC#C29GA

Route 29 (27.9/32) – Road work at Route 281 will conclude on Saturday, June 25. One-way traffic control will be in effect from 5 p.m. to 8 a.m. Motorists should expect up to 15-minute delays. LC#C29FA

Route 29 (49.2/51.2) – Road work in Lakeport near Robinson Rancheria Road will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 10-minute delays. LC#C29VA

Route 53 (1.2/1.4) – Electrical work in Clear Lake at Dam Road will conclude on Friday, June 24. One-way traffic control will be in effect from 6:30 a.m. to 5:00 p.m. Motorists should expect minor slowdowns through the area. LC#C53FA

Route 175 
(18.4/19.5) – Utility work will conclude in Cobb at Bottle Rock Road on Friday, June 24. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should expect 5-minute delays. LC#C175RA

Route 175 (19.2/20) – Bridge work in Cobb at Estates Drive will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 10-minute delays. LC#C175RA

Mendocino County

    

Route 1 (2.1/6.1) – Utility work will occur in Gualala at Haven Neck Drive on Friday, June 24. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P1FA

Route 1 (6.1/38.8) – Utility work will occur from Haven Neck Drive to Navarro Bluff Road on Wednesday, June 29. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P1FA

 

Route 1 (59.6) – Road work in Fort Bragg at the Hare Creek Bridge continues. One-way traffic control will be in effect from 8 p.m. to 7 a.m. Motorists should expect up to 10-minute delays. LC#C1BA


Route 1 (63.8/66.8) – Utility work will occur in Fort Bragg from Happy Lane to Little Valley Road on Thursday, June 30. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P1FA

 

Route 1 (75/77.1) – Emergency Road work will occur in Westport from Blue Slide Gulch to Pacific Avenue on Friday, June 24. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect 10-minute delays. LC#C1DA

 

Route 20 (8.1/9.4) – Tree work will occur near Little Lake Road on Monday, June 27. One-way traffic control will be in effect from 6 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P20BA


Route 20 (23.3/27.5) – Paving work is scheduled to begin near Three Chop Road on Monday, June 27. One-way traffic control will be in effect from 6 a.m. to 5 p.m. weekdays. Motorists should anticipate up to 15-minute delays. LC#P20HB

 

Route 20 (32.1/32.8) – Utility work will occur in Willits from Cemetery Road to the Broaddus Creek Bridge on Monday, June 27. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P20BA

 

Route 20 (33.2/38.5) – Tree work in Willits at Franklin Avenue continues. One-way traffic control will be in place from 5:30 a.m. to 5:00 p.m. weekdays. Motorists should expect 5-minute delays. LC#M20FA

Route 20 (34.3/34.8) – Utility work will occur in Willits near Hollands Lane on Friday, June 24. One-way traffic control will be in place from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P20BA

Route 20 (35.8) – Emergency work south of Willits at the Jct 20/101 Bridge continues. One-way traffic control will be in effect from 7 a.m. to 7 p.m. weekdays. Motorists should anticipate up to 15-minute delays. LC#C20TA

U.S. 101 (5/5.9) – Slide removal at Pieta Creek Bridge will continue. Northbound Lane closures will be in effect. Motorists should anticipate 5-minute delays. LC#C101KC

U.S. 101 (23.4) – Bridge work continues in Ukiah at Route 222. Lane closures will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should expect minor slowdowns through the area. LC#101UB


U.S. 101 
(24.5/25.7) – Fence work in Ukiah at the East Perkins Street Overcrossing continues. Lane closures will be in effect from 5:30 a.m. to 6:00 p.m. weekdays. Motorists should expect minor slowdowns through the area. LC#101UB 

 

U.S. 101 (61.8/63.4) – Bridge work will begin near the Irvine Lodge Rest Area on Friday, June 24. One-way traffic control will be in effect from 7 a.m. to 7 p.m. weekdays. Motorists should expect up to 10-minute delays. LC#C101FC

 

U.S. 101 (63.4) – Bridge work south of Laytonville at Long Valley Creek continues. Lane closures will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should expect minor slowdowns through the area. LC#101FC

U.S. 101 (74/75) – Caltrans has granted an encroachment permit for the Kate Wolf Festival south of Rattlesnake Summit from Thursday, June 23 to Monday, June 27. Lane closures will be in effect from 6 a.m. to 5 p.m. Motorists should expect up to 10-minute delays. LC#P101FA

U.S. 101 (78.5/79) – Drainage work north of Spyrock Road will continue. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should expect up to 10-minute delays. LC#C101UC

U.S. 101 (78.7/79.7) – Tree work will occur north of Spyrock Road on Monday, June 27. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#P101FA

U.S. 101 (82.5) – Empire Camp Safety Rest Area will be closed through July 2022. LC#C101TB

Route 128 (33/33.8) – Utility work will occur west of Orbaun Creek on Wednesday, June 29. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate up to 10-minute delays. LC#P128AA

Route 162 (11/12.6) – Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays. LC#C162IA

Route 271 (5.5) – Bridge work south of Leggett will begin on Monday, June 27. One-way traffic control will be in effect from 7 a.m. to 7 p.m. weekdays. Motorists should expect 5-minute delays. LC#C271HA

Route 271 (16.9/17) – Slide removal continues south of Piercy near Reynolds State Park Road. A lane closure is in effect and motorists should use an alternate route. LC#T271BA

*Items in bold indicate updates from the previous week

Facebooktwitterpinterestmail

Join the discussion! For rules visit: https://kymkemp.com/commenting-rules

Comments system how-to: https://wpdiscuz.com/community/postid/10599/

Subscribe
Notify of
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Comments
Inline Feedbacks
View all comments