Monument Beach

Monument Beach, MA · Traffic & Transit
umassmedia.com
Passengers stranded after Commuter Rail stops on tracks
The Commuter Rail broke down for up to four hours Oct. 27, leaving passengers stranded, frustrated and asking for answers from transit. That evening at around 3:47 p.m., passengers boarded the Commuter Rail from South Station to Providence and were set to arrive at their last stop at around 5:00 p.m.but found themselves stranded. The train had made only a few stops before stopping at Ruggles. By 4:31pm the train had announced the delay to passengers due to “Technical Issues” creating confusion and concern for those onboard.
bostonrealestatetimes.com
Boston Completes $28 Million Cummins Highway Reconstruction, Reports Record Year for Street Improvements
BOSTON — Mayor Michelle Wu announced Tuesday the completion of Boston’s $28 million Cummins Highway reconstruction in Mattapan and highlighted a record year of citywide infrastructure improvements, including roadway resurfacing, accessibility upgrades, street lighting, parking meter modernization and expansion of the Bluebikes network. The Cummins Highway project, completed...
Turnto10.com
MassDOT installs new wrong-way vehicle detection system in Fall River
FALL RIVER, Mass. (WJAR) — The Massachusetts Department of Transportation installed a wrong-way vehicle detection system on an I-195 exit ramps in Fall River on Tuesday. According to officials, the system was installed on the exit 13 eastbound and westbound ramps at Plymouth Avenue. MassDOT said the work began...
belmontvoice.org
Belmont Considers Chargers, Parking and its Grid
Most summer afternoons between 2 and 7 p.m., Belmont residents switch on their air conditioners and fire up their stoves for dinner. Those are the hours when the town uses the most electricity, according to Belmont Light, the town’s power utility, and it would like to change that. “The...
Boston
Amtrak adds final steel beam at new Boston maintenance facility
The upgrades will benefit Amtrak customers across the East Coast. Amtrak’s new maintenance and inspection facility in Boston has reached a construction milestone. Workers have placed the final steel beam on the 860-foot-long facility at Southhampton Yard, which will be used for daily inspections, service, cleaning, and more. Construction began in late 2025 and will be completed in phases through 2029.
Dorchester Reporter
Worrell, Culpepper appeal to Healey for a halt to Blue Hill Avenue project
Above: Mayor Wu spoke at an event to highlight the completion of a city project to improve Cummins Highway in Mattapan on Tuesday, Nov. 17, 2026. State Rep. Russell Holmes is shown at right and City Councillor-at-Large Ruthzee Louijeune at left. Seth Daniel photo. Copyright © 2026 Boston Neighborhood News,...
hinghamanchor.com
The Enterprise
'Bloodsuckers.' Brockton ride-share drivers rally for union contract
BROCKTON — Brockton's Leonel De Andrade drives for ride-share companies 12 hours a day to support his grandson. On Tuesday, Nov. 17, he joined a caravan of two dozen drivers from Westgate Mall to a union rally at UMass Boston. De Andrade, a member of the nascent App Drivers Union representing Uber and Lyft drivers in Massachusetts, is fighting for a contract. The companies and the union have been negotiating since August, the union said. A labor agreement for ride-share drivers would be the first of its kind in the nation. "The risk is more than the profit," De Andrade said. Among the risks is "deactivation." That's when the company won't allow a driver to work for them for various reasons. In his case, Uber cut him off for seven months because of a mix-up in Social Security numbers with his sister, who lives abroad. He kept driving for Lyft during that time. No matter how contract negotiations work out, De Andrade drew strength from not being alone. "Even if I don't have a contract, you have some support," he said. From Tent City to 1,400 units Brockton Yards could transform downtown Driver says riders would benefit too Osama Abusabiha
brookline.news
Town planning 42 new speed humps in two Brookline neighborhoods
Town officials are getting closer to installing 42 new speed humps in two Brookline neighborhoods. Last year the town installed 37 speed humps on Buckminster, Clinton, Clark and Beaconsfield Roads and Tappan Street. Now, the Traffic Calming Subcommittee of the Transportation Board has proposed 42 more in two clusters, one...
mbta.com
Upcoming December MBTA Construction Work to Improve Service, Reliability, and Accessibly of System
With the goal of improving the reliability and accessibility of the T for all riders, the MBTA today announced major construction work will continue in December to upgrade and enhance the subway and Commuter Rail system. Riders can find more information on service changes through in-station signage, in-station public announcements,...
fallriverreporter.com
City of Fall River announces 2026 Parking Ticket Amnesty Program
Fall River, MA — Mayor Paul Coogan and Director of Traffic and Parking Stephanie MacArthur announce a Parking Ticket Amnesty Program. The program will run from December 1, 2026, through December 30, 2026. City-imposed late fees will be waived on any outstanding parking violations issued between January 1,2026 -November...
hoodline.com
South Boston Bike Lane Ripped Out After Seniors Say It Blocked Their Front Door
A bike lane that appeared outside a South Boston senior housing building in August has already been ripped out, after residents said the roughly two-hundred-foot stretch of pavement cut off access to their front door and never connected to anything else in the first place. Construction crews pulled out the concrete barriers and paved over the unfinished gravel surface in late October, less than three months after the lane first went in.
capecod.com
whdh.com
Traffic reopens after tractor-trailer rollover blocks all lanes on Mass Pike in Allston/Brighton area
ALLSTON, MASS. (WHDH) - A tractor-trailer rollover caused significant delays on the Pike on Tuesday afternoon. The tractor-trailer flipped on its side around noon, blocking all lanes on the eastbound side of the highway. It remained on the road for hours before crews were able to move it, causing traffic to be at a standstill.