undefined

Posts

undefined

Followers

User since undefined NaN
Meridian

Idaho's tallest mass timber building to be completed this fall

By Kelly Holm,

2026-07-27

https://img.particlenews.com/image.php?url=3OysuN_1Dgxc5va00

MERIDIAN — Frontier Credit Union’s new regional headquarters, located at the corner of Franklin and Ten Mile, will carry a unique distinction come opening day this fall.

The four-story, 30,000-square-foot structure, costing approximately $10 million, will be the tallest building in the Gem State constructed primarily of mass timber.

“You don’t see that very often. It’s always cheaper or more economical to go with steel construction,” Cole Architects project manager Kiran KC said. “Timber comes with a cost that most owners kind of defer away from, so you don’t see that a lot.”

Also known as engineered wood, mass timber is created by attaching veneers, fibers or boards of wood together with adhesives to produce a composite material.

The Frontier building largely contains cross-laminated timber — in which three or more panels of lumber are stacked and bonded together at alternating right angles — and glue-laminated timber, in which panels are fused so that their individual wood grains run parallel to each other.

“From what I heard, it was fun putting it together,” assistant superintendent Devin DeVoe, whose Construction Solutions Company was behind the project, said of the engineered wood during a July 23 tour of the structure.

During the event, hosted by Cole Architects in collaboration with Idaho Women in Architecture, Engineering and Construction, attendees got to tour the bones of what will become the credit union’s regional home base, as well as upper floors which will be leased out as office space, and a rooftop patio.

Mass timber has grown in popularity in the Treasure Valley in recent years. Boise State’s new Construction Management building consists of engineered wood, while a mass timber-built concourse at the Boise Airport is in the planning stages.

“Sustainability was a big factor,” KC said of mass timber’s appeal, adding that a wood structure lends itself to a “more welcoming” work environment.

The building will be complete and ready for business at the end of November.

emoji_like
2

Comments