Century

Century, WV · Traffic & Transit
PITTSBURGH TRIBUNE-REVIEW
Route 981 closed in Mount Pleasant following rollover crash
A section of Route 981 in Mount Pleasant was shut down Friday morning following a vehicle crash that downed electrical poles and wires. First responders were dispatched to the 4000 block of Route 981 around 6:35 a.m. for a reported rollover vehicle crash, according to a Westmoreland County 911 dispatcher. The crash occurred near Trauger Lake, said PennDOT spokesperson Melissa Maczko.
connect-bridgeport.com
Busy Clarksburg Bridge Set to See Two-Day Closure
There will be a bridge closure on US 19, Pike Street, at the Point Comfort Bridge, from 7 a.m., Saturday, September 19, 2026, until 5 p.m. Sunday, September 20, 2026, for removal of the expansion dam. Detour is as follows: US 50, Chestnut Street exit, Broadus Avenue, Chestnut Street, WV...
WDTV
Clay-Battelle students learn dangers of drinking and driving through DUI simulator
BLACKSVILLE, W.Va (WDTV) - Students at Clay-Battelle High School experienced the dangers of drinking and driving through a DUI simulator Thursday. The simulator is equipped with a driver’s seat, steering wheel and pedals with a screen that takes students through hazardous conditions. The simulated vehicle becomes harder to operate...
wajr.com
Mountain Line Transit Authority showcases new propane fueled bus, announces plans to expand fleet
MORGANTOWN, W.Va. — A pilot program enacted by the Mountain Line Transit Authority to use propane autogas buses on routes has now been expanded. Mountain Line General Manager Maria Smith was joined by officials with Ferrellgas as well as ROUSH CleanTech, where she announced that the five-bus fleet of propane autogas buses will be doubled within the next year after positive results from the pilot program. State Senator Mike Oliverio, Monongalia County Delegate Evan Hansen, Monongalia County Commission President Tom Bloom, and Morgantown Mayor Danielle Trumble were among those who attended the announcement.
WSAZ
WTOV 9
$5.3M Washington Avenue Bridge rebuild nears finish, reopening eyed in a month
WHEELING, W.Va. — Drivers in Wheeling could be back on the Washington Avenue Bridge in about a month, as crews near the finish line on a $5.3 million project that has faced unexpected obstacles. The bridge was shut down for repairs at the end of 2025 and later collapsed...
WTRF- 7News
Drivers urged to expect delays on National Road
WHEELING, W.Va. (WTRF) — The Wheeling Police Department is advising motorists to expect heavier-than-normal traffic along National Road in the Woodsdale area as a new coffee shop opens this week. In a traffic advisory posted Saturday, police said increased vehicle congestion is anticipated near the newly opened 7 Brew Coffee location, particularly during the morning […]
Parkersburg News & Sentinel
Transportation needs to be discussed at public meeting
A public meeting focusing on the transportation needs in West Virginia for older adults, individuals with disabilities and the public will be held from 3-4 p.m. Sept. 22 at the Mid-Ohio Valley Regional Council, 709 Market St., Parkersburg. The meeting, one of 11 around the state to update the transportation...
connect-bridgeport.com
Clarksburg Bridge Closure on US 19, Pike Street, to Start Saturday, Sept. 12, and Go into Sunday, Sept. 13
There will be a bridge closure on US 19, Pike Street, at the Point Comfort Bridge, from 7 a.m., Saturday, September 12, 2026, until 5 p.m. Sunday, September 13, 2026, for removal of the expansion dam. Detour is as follows: US 50, Chestnut Street exit, Broadus Avenue, Chestnut Street, WV...